Project Management for Enterprise

ENT 6A6: PROJECT MANAGEMENT FOR ENTERPRISE ASSESSMENT TWO BRIEF.
This is an individual assessment that requires students to develop a project plan using MS-Project and
submit an individual report. In the report you will describe the key methods used and steps taken to create
your project plan (include screen shots to evidence your work). Additionally, you are expected to use a
range of academic sources to substantiate explanations of the key techniques used. You will be expected
to reference additional sources beyond the core text and class materials.
The two components to be assessed are:
1) Report: 2,500 created in MS-Word or PDF
2) Project Plan created in MS-Project
After considering your initial scoping and planning documentation from assessment one, the Business
Owner of Northampton Taxis has contacted you to run the project for the company. In light of the
considerations presented from the initial scoping and planning documentation, the Business Owner has
made the following adjustments to the project scope:
Project: Northampton Taxis Website Development Project
Start Date: 2nd March 2020
Required End Date: 58 working days from the start date
Budget: £13,000
Quality Specifications: Website design confirms to established guidelines as well as meeting requirements
specified in the Data Protection Act (UK Legislation 1998).
You will need to create a project plan starting from the 2nd March 2020. Project task durations and costs
allocated to each task can be found in table 1. You are required to consider the resources needed to
undertake the project, how much you will spend on material and work resources and to ensure the project
is planned to complete within time and on budget.
The report will enable you to demonstrate your individual reflections and understandings on the criticality
of project planning and monitoring and control. There are four key sections to the report, which are:
Section One: Introduction
Section Two: Planning (see Project Plan section)
Section Three: Monitoring and Control (see Project Plan section)
Section Four: Evaluation (refer to Marking Scheme)
You must include a reference page at the back – remember to cite academic sources. The work must
also include a title page (with student name and number clearly specified) and a content page.
Course: ENT 6A6: Project Management for Enterprise
Assessment: Assessment Two: Creating a Project Plan
Report Word Count: 2,500 words maximum
TMM: 60%
Summative Submission: Project Plan in MS Project (Friday 1
st May 2020 by 11.59pm)
Individual Report in MS Word/PDF (Friday 1
st May by 11.59pm)
Module Leader: Dr. Sylvie Studente
ASSESSMENT OVERVIEW:
CASE STUDY: NORTHAMPTON TAXIS
THE REPORT:
ENT 6A6: PROJECT MANAGEMENT FOR ENTERPRISE ASSESSMENT TWO BRIEF.
In the Planning and Monitoring and Control sections of your report, you need to evidence the following
using MS-Project:
Planning Monitoring and Control
• Set the project start date
• Enter all project tasks, durations and dependencies
• Enter all project phases
• Entering work resources
• Entering material resources
• Assigning resources
• Changing the working time of a resource
• Dealing with resource overallocation
• Adding milestone tasks
• Adding a deadline task
• Adding recurring tasks
• Adding a task constraint
• Saving a baseline
• Entering completed tasks
• Entering 75% completed tasks
• Entering 50% completed tasks
• Entering 33% completed tasks
• Entering task notes
• Entering resource notes
• Missing deadline date
• Task variance
• Cost variance
Submission requirements for this assessment are outlined in the table below:
Submission Item Information Submitted Via Submission date
Project Plan
An electronic copy of
the project plan in MSProject
The project plan should feature
the elements indicated on the
marking scheme.
Blackboard Friday 1
st May by
11.59pm.
Individual Report
An electronic copy of
the report in MS-Word
or PDF format
The report should be formatted as
follows: Arial, size 12, single line
spacing. Include a contents page
and a title page (with your name
and student number)
Blackboard Friday 1
st May by
11.59pm.
Plagiarism includes submitting work that has been written by someone else and copying passages from
other sources without references. Plagiarism is easy to detect and will be acted upon. The Academic
Misconduct procedures at Regent’s University London will be followed in cases of plagiarism.
THE PROJECT PLAN:
SUBMISSION REQUIREMENTS:
PLAGIARISM STATEMENT:
ENT 6A6: PROJECT MANAGEMENT FOR ENTERPRISE ASSESSMENT TWO BRIEF.
Table 1: Project Activity Information
Activity
ID
Phase
Number
Phase Description Activity Name Predecessor Duratio
n
E (D)=
Cost
A One Requirements Analysis Elicit client needs – 2 £420
B One Requirements Analysis Target audience analysis A 2 £400
C One Requirements Analysis Gain server access – 2 £200
D One Requirements Analysis Gain required resources A 3 £200
E One Requirements Analysis Requirements specification B, D 4 £400
F One Requirements Analysis Gain approval E 2 £100
G Two Prototyping Create prototype C, F 3 £200
H Two Prototyping Approval of prototype G 2 £175
I Two Prototyping Test prototype H 1 £250
J Two Prototyping Amend prototype I 2 £100
K Two Prototyping Gain approval from J 2 £130
L Three Development Create coding templates K 4 £1,000
M Three Development Create HTML and CSS documents L 8 £1,000
N Three Development Develop interactive components M 3 £1,500
O Three Development Add content K, L 4 £2,000
P Three Development Verify site links O 2 £200
Q Three Development Verify functionality P, N 2 £100
R Three Development Gain approval from client Q 2 £100
S Four Testing Cross browser testing R 3 £200
T Four Testing Error testing R 2 £200
U Four Testing User group testing R 4 £1,000
V Four Testing Amendments arising from testing S, T ,U 5 £1,800
W Four Testing Gain approval from client V 2 £240
X Five Training Provide client with training W 3 £300
Y Six Project Close Connect website to database W 2 £200
Z Six Project Close Launch website X, Y 2 £150
ZA Six Project Close Project Review and Close Z 2 £150
ENT 6A6: PROJECT MANAGEMENT FOR ENTERPRISE ASSESSMENT TWO BRIEF.
INTRODUCTION 5% Grade
Introduction to the project aims and objectives 5
PLANNING 35%
Set project start date / enter tasks, durations and
predecessors / enter project phases / save baseline 10
Entering and assigning work resources / dealing with over
allocation / changing working time 20
Adding milestone / deadline and recurring tasks / task
constrain 5
MONITORING & CONTROL 20%
Completed and partially entered tasks / missing deadline
date 5
Resource and task notes entered 5
Cost & task variance 10
CRITICAL EVALUATION 10%
Critical reflection on aims & objectives 5
Recommendations for future projects 5
QUALITY OF WORK & REFERENCING 30%
Quality of report and referencing 5
Explanations of key techniques and critical review 25
TOTAL GRADE 100
GRADING SCHEME:

Essay Mill

Share
Published by
Essay Mill

Recent Posts

Childbirth

For this short paper activity, you will learn about the three delays model, which explains…

9 months ago

Literature

 This is a short essay that compares a common theme or motif in two works…

9 months ago

Hospital Adult Medical Surgical Collaboration Area

Topic : Hospital adult medical surgical collaboration area a. Current Menu Analysis (5 points/5%) Analyze…

9 months ago

Predictive and Qualitative Analysis Report

As a sales manager, you will use statistical methods to support actionable business decisions for Pastas R Us,…

9 months ago

Business Intelligence

Read the business intelligence articles: Getting to Know the World of Business Intelligence Business intelligence…

9 months ago

Alcohol Abuse

The behaviors of a population can put it at risk for specific health conditions. Studies…

9 months ago